Windsor California Homepage
Search

Frequently Asked Questions

Utility Billing Fees

3
  • The Town charges a $200 deposit for: • Tenants without prior payment history with the Town of Windsor • Tenants whose payment history was not in good standing on a prior account • Account holders who are locked off for non-payment
    Utility Billing Fees
  • Your paid deposit will be credited to your account after 12 months of on-time payments.If your account has a deposit at the time your closing bill is run: • The deposit will be used to pay any outstanding charges under your customer number. • Any remaining deposit will be sent to the mailing address on record.
    Utility Billing Fees
  • Your account will be assessed an administrative disconnect fee if payment has not been made for past due charges by the date service is scheduled to be locked off, unless payment arrangements have previously been set up with Utility Billing staff. Duties for processing disconnections begin prior to field staff locking off the service.
    Utility Billing Fees

Building Division

3
  • The best way to find out if you need a permit is to call the Building Division at (707)838-5341. Feel free to discuss your project with the code official before beginning construction to determine whether a permit is required.

    Building Division
  • The cost of the permit depends on the type and size of the project. The fees are based on the total valuation of the project, as well as the amount of mechanical, electrical, and plumbing work associated with the project.

    Building Division
  • Residential plan checks are completed within fifteen (15) working days of receipt of a complete set of construction plans. Non-residential plan checks are completed within twenty (20) working days of receipt of a complete set of construction plans.

    Building Division

Recreation

6
  • The times reflected in the Guide are to give parents a framework in which their child will have his or her game scheduled. Once the schedule is handed out, (at the second practice) and you are assigned to a team, you will know the exact 1-1.25 hour period in which your child will be participating. You need only be present for your scheduled game or practice, not the entire session.
    Recreation
  • Children are not required to have footwear specifically designed for these sports. The normal running shoes or shoes they wear to play at school are fine for both of these activities. We do request that children do not wear black soled shoes in the gym for basketball as they leave marks on the floor. No sandals or open toes are allowed.
    Recreation
  • Yes: We do our best to accommodate all team requests to help with carpooling. At the first two practice sessions, parents will have the opportunity to write down their child’s name and the name of one friend to be placed together on a team. Although no guarantees are made, we do our very best to fulfill these requests.
    Recreation
  • Call Community Services at 838-1260. We can give the information over the phone or fax the information.
    Recreation
  • Camp supplies, food, and staffing are based around the number of participants enrolled in each week long session as a whole. Unfortunately we can not pro-rate families that miss a day during a session.
    Recreation
  • Security guards will be required at any event where alcohol is being served/sold. Security guards may also be required at large events where alcohol is not being served or at youth-oriented events. Security information can be found in the Facility Use and Reservation policy by visiting Facility Rentals webpage or by calling (707) 838-5943.
    Recreation

General Plan

13
  • Land use changes are being proposed as part of an update to the Town’s General Plan.  The General Plan sets forth a vision for future growth and development of the community. In certain areas of town - mostly along Old Redwood Highway, Shiloh Road (east of Highway 101), and the northern and eastern edges of town –  the General Plan envisions changes to the current uses in these areas.  The envisioned changes are based on input received from the community over the course of the past three years during a series of workshops and public hearings that focused on the General Plan update.  The land use changes being proposed will serve to guide new development in these areas towards the uses that the General Plan envisions for the future.

    General Plan
  • The General Plan is the Town’s long-term blueprint or “constitution” for future growth and development. The General Plan represents the community’s vision for its future. This vision is expressed in narrative form with goals, policies and programs that address a  wide range of topics, including land use, transportation, housing, public services and facilities, parks and recreation, economic development, environmental resources, conservation, noise, open space and safety.  The General Plan provides a basis for land use decision-making and capital investments in public facilities and infrastructure.  California state law requires each city and county to adopt a General Plan.  

    General Plan
  • The Town of Windsor adopted its current General Plan in 1996. Since that time the Town has grown and changed. When the last General Plan was adopted, the internet was not widely used and the youngest members of today’s workforce had not yet been born. New laws have passed that affect general plans and new planning strategies have been developed. These changes require a reevaluation of the existing General Plan and confirmation of the vision for Windsor. The updated General Plan will look ahead to the year 2040, so the update will not only bring policies and programs up to date, but also position Windsor for the next 22 years. 

    The proposed update to the Town’s General Plan can be viewed/downloaded from: http://www.windsor2040.com/documents/ 

    General Plan
  • State law requires the General Plan to identify the location, type and intensity of land uses allowed within the area over which the Town has jurisdiction.  This is done by designating every property in Town with a specific “land use designation.” The land use designation identifies the general type of use (e.g., residential, commercial, industrial) and the intensity of the use.  For residential uses, intensity is stated in terms of dwelling units per acre.  For non-residential uses, intensity is stated in terms of a ratio of building floor area to property size (“Floor Area Ratio” or “FAR”). 

    A table describing each of the land use designations in the current General Plan and the equivalent designation being proposed in the updated General Plan can be accessed from this link Land Use Comparison Table.   Maps showing the location of each land use designation in the current and proposed General Plan can be accessed from this link Maps

    General Plan
  • As part of the General Plan update the name of some Land Use Designations are being updated and/or the intensity of allowable development is being adjusted, but the type and physical character of the use will generally remain the same.  For example, there are many properties with a current General Plan Land Use Designation of “Medium-High Density Residential (8 to 12 dwelling units per acre)” that are being changed to “Medium Density Residential (8 to 16 dwelling units per acre).” In this example, the change is largely a technical change and will not result in a significant change to the type of uses or physical character of development in areas with this designation. While the change is not considered significant, State law still requires the Town to send notification of any change to the land use designation.  

    General Plan
  • The Town’s General Plan includes areas within town limits and unincorporated county areas that are outside of town limits but within the Town’s Urban Growth Boundary.  It is presumed that during the next 20 years properties located outside of town limits but within the Town’s Urban Growth Boundary could be annexed into the town.  To ensure that these properties develop in a manner that is consistent with established land use patterns and the Town’s vision for the future, the Town’s General Plan identifies an appropriate land use designation to guide their future development if and when they are annexed into the town.  The Town’s General Plan Land Use Designation will only apply to the use of your property if it is annexed in the future.  Until such a time, the use of your property will continue to be regulated by the County of Sonoma.  

    General Plan
  • The General Plan Land Use Designation regulates how your property is used – in terms of the general type of use and the intensity of the use.  For example, if your property is designated for residential use by the General Plan, you can only use your property for residential purposes.  You could not have a grocery store or an office building on your property. 

     The General Plan Land Use Designation also establishes the intensity of use.  For residential developments, the intensity of use is regulated by an allowed density range (minimum and maximum) that is measured in terms of “housing units per acre.”  Density is calculated by dividing the number of housing units on the site by the gross acreage of the site.  Most residential neighborhoods in Windsor have a density range between 3 and 8 units per acre.  Apartments and townhomes are located in areas that have a higher allowable density range (e.g. 16 to 32 units per acre). 

    For commercial and industrial developments, intensity is measured in terms of Floor Area Ratio (FAR).  FAR refers to the ratio of building floor space compared to the square footage of the site.  FAR is calculated by dividing the floor area of all buildings on the site by the total square footage of the site.  For example, a 12,500 square foot building on a 25,000 square foot site has an FAR of 0.5.  

    A graphic example of how density and FAR are measured can be viewed from this link Density and Intensity Table.  

    A table describing each of the land use designations in the General Plan, including the type and intensity of uses allowed under each designation can be accessed from this link Land Use Comparison Table.    

    General Plan
  • The General Plan sets forth long-term policies that guide future development. The Zoning Ordinance implements General Plan policies through the established detailed development regulations (see Zoning Designation response below). Although the purpose and intent of zoning is different from the General Plan, State law requires that zoning be consistent with maps and policies in the General Plan.  

    A table showing the Zoning Designation that implements the General Plan Land Use Designations proposed by the update to the Town’s General Plan can be accessed from this link Zoning Implementation Table. 

    The Town’s Zoning Ordinance can be viewed/downloaded from: https://www.townofwindsor.com/DocumentCenter/View/15921 

    General Plan
  • Like General Plan Land Use Designations, each property within the Town has a Zoning District designation.  Zoning Districts identify specific types of uses allowed in the district as well as building standards and permitting procedures.   Zoning Districts are a tool for implementing the General Plan Land Use Designation and must be consistent with the General Plan Land Use Designation in terms of the types and intensities of uses allowed in the district.   For example, if your property has a General Plan Land Use Designation of Residential - 5 to 8 dwelling units per acre, your property would be “zoned” with a Zoning District that allows for residential uses with building and development standards that accommodate development at a range of 5 to 8 units per acre. 

    A table listing each of the Zoning District designations in the Town’s Zoning Ordinance and the corresponding General Plan Land Use Designation that it implements can be accessed from this link Zoning District Descriptions.    

    A map of Zoning Districts within the Town can be viewed/downloaded from the following link: /DocumentCenter/View/22059/Zoning-Map-2019-01-30


    General Plan
  • No.  As part of the General Plan Update, staff and the consultant team proposed to update the land use designations in the General Plan to reduce the number of designations and to make them more consistent with current naming conventions.  As part of this, the “Mobile Home Park” designation was initially proposed to be combined with the “Medium Density Residential” designation (which would have included mobile home parks).  This proposal caused a significant amount of concern among mobile home park residents.  One major concern is that changing the designation would make it easier for mobile home park owners to close or convert the park to another use.

    While staff believes that adequate State regulations are in place to address potential closure or conversion of a mobile home park to another use, it is recognized that having a specific Mobile Home Park land use designation could provide an added layer of protection.  In response to the level of concern expressed by mobile home park residents, and because the change was being proposed for administrative purposes rather than a policy-driven matter, staff is recommending that the Mobile Home Park General Plan Land Use Designation not be changed and retained in the 2040 General Plan and applied to all existing mobile home parks.



    General Plan
  • Additional questions about the proposed land use changes, the General Plan update program or the Zoning Ordinance should be directed to the Community Development Department.  Department staff can be reached by phone at (707) 838-1021 or can be visited in person at Town Hall, 9291 Old Redwood Highway, Building 400, Monday through Thursday between the hours of 7:00 a.m. and 6:00 p.m.

    General Plan
  • There are two ways to provide comments to the Planning Commission: attend the Planning Commission meeting and speak during the public hearing, and/or provide written comments in advance of the meeting. Information on the public hearing for the General Plan Update, which will include consideration of the proposed land use changes, is provided below:

    HearingDate/Time:  Tuesday, February 27, 2018 at 5:30 p.m.
    Location:  Town Council Chambers, 9291 Old Redwood Hwy, Building 400.

    If you are unable to attend the Planning Commission meeting, you may submit your comments in writing in advance of the public hearing to the attention of:

    Sheila Wolski, Community Development Technician
    Town of Windsor
    Planning Division
    P.O. Box 100
    Windsor, CA 95492

    Email: swolski@townofwindsor.com 

    Planning Commission meeting agendas, including staff reports and other meeting materials can be accessed from the following link: https://www.townofwindsor.com/721/Agendas-Minutes-Videos 

    General Plan
  • The Town of Windsor Town Council will make the final decision on the proposed land use changes as part of their decision on whether to adopt the updated General Plan.  A public hearing before the Town Council on the General Plan update has been tentatively scheduled for April 4, 2018.  At this meeting, the Town Council will consider the recommendations made by the Planning Commission, Town staff and consultant team, and input received from the public. 

    Town Council meeting agendas, including staff reports and other meeting materials can be accessed from the following link: https://www.townofwindsor.com/721/Agendas-Minutes-Videos 

    General Plan

Town Council

8
  • Send your request to Town Clerk/Records Management Technician. To add a Proclamation, please provide your Draft to Town Clerk/Records Management Technician at least one (1) month prior to the meeting date . Upon approval of your request, plan on attending the meeting to accept the Proclamatin. For the Standard Language, find attached
    Town Council
  • You may contact a Town Council via email or by calling (707) 838-5311.
    Town Council
  • The Town Council holds regular meetings on the first and third Wednesday of each month at 6:00 pm in the Town Council Chambers. For detailed calendar, visit the agendas and minutes
    Town Council
  • Council meetings are televised the same day live on the Public Access Channel 27. Meetings can be viewed on the website under Watch Meetings Online.
    Town Council
  • Town Council
  • Please contact Town Clerk or for further details, view the Municipal Election
    Town Council
  • Sign up through Notify Me to receive notifications.
    Town Council
  • Please contact the Town Clerk.
    Town Council

Water Conservation

7
  • The simplest method is to use the online reporting form listed below. For significant leaks creating a health and public safety concern, please call 838-1000.
    Water Conservation
  • Done correctly, irrigating lawns only three days a week in Windsor is both water saving and beneficial for growing more deeply rooted, heat tolerant turf grass. For fixed spray pop-up sprinklers, two shorter applications (4 – 7 min), applied about an hour apart, gets the water deeper into the root zone without runoff. As an example, to run sprinklers 36 minutes per week: Station run time – 1st Start Time – 2nd Start Time – Days 6 minutes – 5:00 a.m. – 6:00 a.m. – M, W, F Sprinkler run times will need to be longer for single and multi-stream rotor type sprinklers that apply water at a slower rate than standard fixed spray pop-ups. However, the approach is the same. The clay based soils found throughout Windsor help retain the water that has penetrated deeper into the root zone, eliminating the need for more frequent irrigation, and providing the conditions needed for lawns to grow longer, healthier roots.
    Water Conservation
  • If possible, you should schedule your irrigation early enough in the morning to be finished before sunrise. This is the time of day when there is the least amount of wind and the least amount of water loss due to evaporation.
    Water Conservation
  • Your water meter's low flow indicator can be used to detect whether you have a leak or not.
    Water Conservation
  • You can install an on-demand recirculation pump, which speeds up the delivery of hot water to the fixture. The water that normally goes down the drain as you wait is returned to the water heater by using the cold water line as a return loop. Once the hot water arrives, water begins to flow out of the fixture and the pump shuts off automatically.
    Water Conservation
  • The Water Use Classification of Landscape Species(WUCOLS), a publication of UC Cooperative Extension, is a comprehensive list of plants classified by their water requirements. The Sonoma County Master Gardeners website (http://groups.ucanr.org/sonomamg/) also maintains a list of plants well suited to our climate.
    Water Conservation
  • You need to call 547-1909 and schedule a free pre-inspection visit / water use assessment before starting work on your project. Visit our rebates page for more information.

    Water Conservation

Risk Management

3
  • The Town of Windsor has insurance specifications for construction projects, professional services, encroachment permits, vendors and events. The details of those requirements can be found by selecting the following link:
    Risk Management
  • The Town of Windsor is a member of the Redwood Empire Municipal Insurance Fund (REMIF) which provides insurance programs for 15 cities along the north coast of California. Our insurance requirements and limits are determined by REMIF to protect both the Town and it’s contractors in the event of a loss.
    Risk Management
  • Town personnel are here to help you and your insurance agent with specific questions or concerns. We are available Monday through Thursday from 7:00 am - 6:00 pm. Please call (707) 838-5362 or email us.
    Risk Management

Public Works

14
  • An Encroachment Permit is required to perform any work in the Town’s right of way.
    Public Works
  • Please contact Sonoma County Resource Recovery at (707) 795-7470 for garbage pick-up.

    Public Works
  • Contact Utility Billing Department (707)838-1004.
    Public Works
  • The sidewalk is in the public right of way, however, it is the responsibility of the property owner to maintain it.
    Public Works
  • When flushed down the drain, some medications are not completely removed by wastewater treatment plants and end up in rivers and streams, harming wildlife. The Russian River Watershed Association is partnering with local agencies to provide safe medicine disposal locations. For disposal information please visit the
    Public Works
  • Road areas that may be dangerous to pedestrians and vehicles should be reported immediately to the Streets Division at (707) 838-1009. A temporary repair will be made followed by a permanent repair as soon as possible.
    Public Works
  • The Town disposes of approximately 350 million gallons through land discharge (irrigation of farm lands) and 300 million gallons through creek discharge annually.
    Public Works
  • Street sweeping is done by the Town’s franchised waste disposal company. You can contact Sonoma County Resource Recovery at (707) 795-7470 or visit their website: www.sonomacorr.com

    Public Works
  • Storage containers should be out of the Town’s right of way and placed in the driveway. If this is not possible you must fill out an Encroachment Permit application. The application should include the dimensions of the container and the duration the container will be within the Town right of way (street) and be placed so as not to cause any traffic obstruction, sight distance obstacle or safety hazard.

    Public Works
  • The best way to find all recorded interests such as easements in the property is from a current Title Report obtained from a title insurance company. If any easements exist, uses within the easement would be limited so as not to interfere with the purpose of the easement, i.e. a storm drain easement should not be graded or paved over to interfere with drainage of the lot.
    Public Works
  • Please contact Sonoma County Waste Management Agency at (707) 565-3375 for the next hazardous disposal in your area.
    Public Works
  • You may view a list of projects currently bidding by visiting the “Bids” section on the Town of Windsor home page.
    Public Works
  • The Town’s responsibility for maintaining water service ends at the water meter, the customer is responsible for the line on the customer side of the meter.
    Public Works
  • Notification for an inspection can be made up to 24 hours prior to commencing any work shown on the Public Works Permit, and by calling (707) 838-1006. The contractor must show proof that he/she has pulled a Public Works permit.
    Public Works

Water Division

10
  • Phone us at (707) 838-1006 or Utility Billing at (707) 838-1004. For after hours emergencies call (707) 838-1000 and the standby duty person will be contacted.
    Water Division
  • No.
    Water Division
  • Contact Utility Billing Department at(707) 838-1004
    Water Division
  • Pressures vary throughout the Town’s water distribution system. Contact us via email or phone (707) 838-1006 and we will schedule a Water Operator to check your pressure and provide you with the test result.
    Water Division
  • The average hardness level is 8-11 gpg.
    Water Division
  • We dig out the box just enough to expose the register cap, wipe off the face of the register above the odometer dial, and get the reading. It doesn't matter if the meter itself is buried. Meter readers often rub their meter hook (the tool they use to remove the meter box lid) over the face of the register to expose the odometer type dial. If you don't believe your meter is being read, read it yourself and compare the results to the reading printed on your water bill. Be sure to make allowances for any difference between the day you read the water meter and the day it is read by the meter reader.
    Water Division
  • All of our residential water meters (meters 1" in size and smaller) are positive displacement meters. We buy this type of meter because when they fail, they fail in favor of the consumer. The manufacturer certifies the accuracy of the meters when they are new. With age and extended usage they either maintain their accuracy or they slow down.
    Water Division
  • In large part, the effects and feel of hard water vs. soft water are subjectively based on what the individual is accustomed to. Some people are acclimated to soft water and opt to install and use water softeners on their home water system. These can reduce hardness and related hardness effects. Persons with sodium regulated diets are cautioned to avoid the types of softeners that increase sodium content in their drinking water. If individuals who insist on having a water softener have concerns about sodium they should specify installation of another type of water softener that does not increase sodium. Or, sodium can be removed after softening by a point-of-use filter/conditioner at the tap.
    Water Division
  • During regular business hours, call us at (707) 838-1006 and ask to speak with a Water Operator. For after hours emergencies call (707) 838-1000 and the standby duty person will be contacted.
    Water Division
  • The Town’s responsibility for maintaining water service ends at the water meter, the customer is responsible for the line on the customer side of the meter.
    Water Division

Economic Development

1
  • We work with the Small Business Development Center (SBDC). There is a counselor available to meet with you at their Santa Rosa location one-on-one to discuss finance, marketing and other business matters. The SBDC can be reached at 524-1770.
    Economic Development

Facilities

1
  • Security guards will be required at any event where alcohol is being served/sold. Security guards may also be required at large events where alcohol is not being served or at youth-oriented events. Security information can be found in the Facility Use and Reservation policy by visiting Facility Rentals webpage or by calling (707) 838-5943.
    Facilities

Town Clerk

11
  • Send your request to Town Clerk. To add a Proclamation, please provide your Draft to Town Clerk at least one (1) month prior to the meeting date . Upon approval of your request, plan on attending the meeting to accept the Proclamation. For the Standard Language, find attached
    Town Clerk
  • The Town Council holds regular meetings on the first and third Wednesday of each month at 6:00 pm in the Town Council Chambers. For detailed calendar, visit the agendas and minutes
    Town Clerk
  • Council meetings are televised the same day live on the Public Access Channel 27. Meetings can be viewed on the website under Watch Meetings Online.
    Town Clerk
  • Town Council Meetings are televised. You may order a DVD of the meeting, at a cost. You might also subscribe through Notify Me to receive notifications as new documents are available.
    Town Clerk
  • Town Council Minutes are not posted on the website until approved by Town Council at the subsequent meeting. Please contact the Town Clerk for any further questions.
    Town Clerk
  • Please view the
    Town Clerk
  • Please fill out the attached
    Town Clerk
  • You may contact the Building Department directly. You may also complete the attached Public Records request
    Town Clerk
  • Please view the Public Hearing Notices
    Town Clerk
  • You must be registered to vote 15 days prior to an election, to be eligible to vote. For further information, please visit the
    Town Clerk
  • Town Offices close at 6:00 PM, Monday through Thursday. We are closed on Fridays.

    Town Clerk

Engineering

3
  • An Encroachment Permit is required to perform any work in the Town’s right-of-way.
    Engineering
  • Debris containers should be out of the Town’s right-of-way and placed in the driveway only on a temporary basis. If this is not possible, you must fill out an Encroachment Permit application. The application should include the dimensions of the container and the duration the container will be within the Town right-of-way (street) and be placed so as not to cause any traffic obstruction, sight distance obstacle or safety hazard.
    Engineering
  • The best way to find all recorded interests such as easements in the property is from a current Title Report obtained from a title insurance company. If any easements exist, uses within the easement would be limited so as not to interfere with the purpose of the easement, i.e. a storm drain easement should not be graded or paved over to interfere with drainage of the lot.
    Engineering

Water Reclamation

8
  • The Town disposes of approximately 350 million gallons through land discharge (irrigation of farm lands) and 300 million gallons through creek discharge, annually.
    Water Reclamation
  • Reclaimed water, also referred to as recycled water, is municipal wastewater that has been cleaned and treated in order to remove pollutants and contaminants so that the water can be safely reused for a variety of uses. The California Department of Health Services has established the treatment standards and regulations regarding any reuse. Windsor treats its wastewater to tertiary recycled water standards (also referred to as advanced water treatment) which is the highest level of treatment defined by the State and allows for unrestricted reuse in virtually all reclaimed water applications. Examples of common recycled water reuse applications include: Any agricultural irrigation (food crops, vineyards, sod farms, Christmas tree farms, etc), ornamental plants, parks and playing fields, golf courses, cemeteries and recreational waterways for boating and swimming, cooling tower water, groundwater recharge and toilet flushing. Recycled water is an excellent substitute for drinking water in many applications especially in areas experiencing drinking water shortages due to droughts or limitations on supply.
    Water Reclamation
  • Yes. Recycled water must meet stringent regulatory requirements monitored by the State Department of Health Services and be treated to the State of California Title 22 standards for tertiary (advanced) treatment of water. It must also meet regional and local standards. Wastewater is treated to these rigid standards to ensure that public health and environmental quality are protected. The Town's recycled water is monitored and tested daily to ensure that it consistently meets these high quality standards.
    Water Reclamation
  • Recycled water systems have been operating in California and throughout the nation since the early 1960’s. As Sonoma County and California water supplies are stretched, using recycled water for irrigation preserves drinking water supplies for people and fresh water for creeks, rivers and wetlands. Systems are continuously upgraded in response to treatment breakthroughs and research. Windsor’s Advanced Treatment facility was built in 1991. The facility has since been upgraded and expanded over the years to improve treatment, storage and reuse.
    Water Reclamation
  • Windsor currently provides recycled water for the irrigation of agricultural lands, parks and recreational facilities such as Windsor Golf Course, Windsor High School, the Town Green and Wilson Ranch Soccer Park. Recycled water is also used to water front and back yards in the Vintage Greens neighborhood. These applications save millions of gallons of fresh water each year. The use of recycled water will continue to expand both within and outside of the Town limits.
    Water Reclamation
  • The recycled water quality is monitored by Town personnel daily to ensure that rigid water quality standards are continually met. Additional monitoring is done by local regulatory agencies. Water testing takes place throughout the treatment process. Water quality testing results are reported to, and monitored by, regulatory officials to ensure high quality standards are met.
    Water Reclamation
  • Windsor has been operating its Advanced Water Treatment (tertiary) facility since 1991. The facility has since been upgraded twice in order to improve its processes and increase plant capacity. The latest technology is used for odor control equipment and disinfection throughout the facility.
    Water Reclamation
  • See Brochure for full details.
    Water Reclamation

Street Maintenance

2
  • Street sweeping is done by the Town's franchised waste disposal company. Contact Windsor Refuse & Recycling at (707) 586-5545
    Street Maintenance
  • The sidewalk is in the public right of way, however, it is the responsibility of the property owner to maintain it.
    Street Maintenance

Police

3
  • The maximum amount of time a recreational vehicle can be parked on any public street is 18 hours. After 18 hours you can be fined $146 or risk your vehicle being towed.

    Police
  • A copy of a report can be requested by phone, in person, or by mail. (**Please note in person inquiries may not always be fulfilled at the time of request based on type of report) It is helpful if you call the police department and request the report before going in person. Have the case number or basic information such as date and time of incident, as well as officers name. If this request is through the mail, please include a self addressed, stamped envelope for return.

    Police
  • Yes, per Windsor Municipal Code Chapter 3-3-200. An application and $90.00 application fee must be submitted to the police department. At that time arrangements will be made for fingerprinting which is done at the Sonoma County Sheriff’s Department. Once a clearance has been received and the application has been approved by the Chief, a permit will be issued. Please read Title III, Chapter three of the Municipal Code for further details.

    Police

Election

2

Voting Information

2
  • You must be registered to vote 15 days prior to an election, to be eligible to vote. To obtain a registration form, visit the
    Voting Information
  • Please visit the Election Schedule
    Voting Information

Parks & Rec Comm

1
  • You may contact a member of the Parks and Recreation Commission by phoning the Parks and Recreation Department at (707) 838-1260; or by e-mailing the Parks and Recreation Commission Recording Secretary at dalcala@townofwindsor.com.

    Parks & Rec Comm

Business License

12
  • A business license is a permit required for doing business within the incorporated area of the Town of Windsor. The Town’s municipal code requires that you obtain a business license when you conduct business within the Town of Windsor, even if your business is located OUTSIDE the town limits or if you have a business license from another city.
    Business License
  • Any person whose business is located in Windsor or conducts business in Windsor must apply for a business license within 30 days of the date the business commences. Conducting business in Windsor without a business license can result in penalties, violation notices, citations and court action.
    Business License
  • The purpose of a business license is to regulate businesses in order to promote improved enforcement of Town, state, federal, or otherwise applicable codes, rules, regulations or laws, at lower public cost, with a higher level of protection of the public. Licensing helps protect the public against threats to public peace, health, safety and welfare, by ensuring compliance with Town ordinances, including those designed to ensure building safety and discourage public disturbances and nuisances.
    Business License
  • The initial application fee and first year’s license is $67. The annual renewal fee is $22 per year. Such fees are established by Resolution of the Town Council and may be amended from time to time.
    Business License
  • All business licenses are valid until December 31st of each year. At least 60 days prior to expiration of a business license, an application of renewal will be mailed to all current business license holders. Business licenses applied for and issued after October 1 of any year shall be valid through the succeeding calendar year. Business licenses expire at the end of the calendar year, or sooner if the person to whom the license is issued ceases operations authorized by the license or the license is revoked.
    Business License
  • The Administrative Services Director shall refer all applications received to the relevant Town departments for review. Each department will examine the application to determine whether any conditions should be assigned to issue the license. Inspection of the site shall be conducted as necessary to determine applicability, compliance with, or the adequacy of conditions to achieve compliance with Town, state, federal or otherwise applicable codes, rules, regulations or laws. The business license will be issued no later than 60 days after the date a complete application is filed, unless grounds for denial exist as established in the Town’s ordinance. The Administrative Services Director may issue the business license upon such conditions as are necessary to ensure safety and prevent the business from disturbing the peace and tranquility of the neighborhood in which it is located. The conditions may include, but are not limited to the following: 1.Limitations upon hours or days of operation, when required in order to prevent disturbance of the peace and quiet of a neighborhood caused by the business or the patrons of the business 2.Requirement that the business provide licensed or other qualified security personnel for the exterior or interior of the business during operating hours 3.Requirement that the business fund any additional law enforcement services required as a result of the operations of the business 4.The installation of on-site improvements required to prevent operation of the business from disturbing its neighbors at a particular location; or 5.Other conditions related to operations or improvements demonstrated under the particular circumstances to be necessary in order to prevent hazards, disturbance of the peace, quiet or safety of the neighborhood; or other nuisance. Such conditions may be imposed at the time a business license is initially issued, renewed, or at any time during the term of the license.
    Business License
  • Yes. Businesses operated out of the home require a business license and must comply with the Town’s zoning codes. These codes regulate the types of home-based businesses allowed in the Town and the manner in which they may operate.
    Business License
  • A separate business license is required for each location or branch of a business within the Town. A business license issued for a fixed location is only valid for the location listed on the license.
    Business License
  • No. A business license cannot be transferred or re-assigned. As a new owner, you need to apply for a new business license in your name.
    Business License
  • Yes. Any person licensed as a contractor by the State Contractor’s Board must obtain a business license if they are conducting business in the Town, or the business is based in the Town whether conducting business in or outside of the Town.
    Business License
  • A business determined to be operating without a business license, when one is required, shall have ten days to obtain the necessary business license. If a complete application is not received by the end of the ten-day period, the applicant will be subject to a penalty of 50% of the application fee. If the business continues to operate beyond the ten-day period, the business may also be subject to other penalties authorized by the Town Code. An application for a renewal of a business license will be deemed received late and subject to a penalty of 50% of the processing fee if the complete application, including all fees, is not received by the Administrative Services Department within 60 days of the date of expiration of the immediately preceding license. If the business continues to operate without a valid license, the business may be subject to all other penalties authorized by the Town Code.
    Business License
  • Operating a business without a business license in violation of the Town Ordinance, after service of written notice advising of the violation and ordering cessation of operations, is deemed to be a public nuisance and shall constitute a misdemeanor. Except as otherwise specifically provided; any violation of this Ordinance shall constitute an infraction and will be subject to the fines and administrative penalties as provided in the Ordinance. The Town may use all available legal means to enforce this Ordinance, including but not limited to, injunctions or other civil proceedings.
    Business License

Recycled Water

9
  • Reclaimed water, also referred to as recycled water, is municipal wastewater that has been cleaned and treated in order to remove pollutants and contaminants so that the water can be safely reused for a variety of uses. The California Department of Health Services has established the treatment standards and regulations regarding any reuse. Windsor treats its wastewater to tertiary recycled water standards (also referred to as advanced water treatment) which is the highest level of treatment defined by the State and allows for unrestricted reuse in virtually all reclaimed water applications. Examples of common recycled water reuse applications include: Any agricultural irrigation (food crops, vineyards, sod farms, Christmas tree farms, etc), ornamental plants, parks and playing fields, golf courses, cemeteries and recreational waterways for boating and swimming, cooling tower water, groundwater recharge, and toilet flushing. Recycled water is an excellent substitute for drinking water in many applications especially in areas experiencing drinking water shortages due to droughts or limitations on supply.
    Recycled Water
  • Yes. Recycled water must meet stringent regulatory requirements monitored by the State Department of Health Services and be treated to the State of California Title 22 standards for tertiary (advanced) treatment of water. It must also meet regional and local standards. Wastewater is treated to these rigid standards to ensure that public health and environmental quality are protected. The Town's recycled water is monitored and tested daily to ensure that it consistently meets these high quality standards.
    Recycled Water
  • Recycled water systems have been operating in California and throughout the nation since the early 1960’s. As Sonoma County and California water supplies are stretched, using recycled water for irrigation preserves drinking water supplies for people and fresh water for creeks, rivers, and wetlands. Systems are continuously upgraded in response to treatment breakthroughs and research. Windsor’s Advanced Treatment facility was built in 1991. The facility has since been upgraded and expanded over the years to improve treatment, storage, and reuse.
    Recycled Water
  • The recycled water quality is monitored by Town personnel daily to ensure that rigid water quality standards are continually met. Additional monitoring is done by local regulatory agencies. Water testing takes place throughout the treatment process. Water quality testing results are reported to, and monitored by, regulatory officials to ensure high quality standards are met.
    Recycled Water
  • Windsor has been operating its Advanced Water Treatment (tertiary) facility since 1991. The facility has since been upgraded twice in order to improve its processes and increase plant capacity. The latest technology is used for odor control equipment and disinfection throughout the facility.
    Recycled Water
  • Because tertiary treated recycled water is approved for full body contact, there is no danger from being sprayed or swimming in it. Physical contact with recycled water is not known to have any adverse or ill effects.
    Recycled Water
  • Although the town’s recycled water is approved for full body contact and fish life, the Town does not permit its use in swimming pools and spas at this time. Rather, the Town is trying to convert urban landscape irrigation to recycled water usage wherever possible. Landscape irrigation continues to account for the largest water usage during peak demand periods and continues to be the most practical use of recycled water and preserves our limited potable water supply.
    Recycled Water
  • No health related problems have ever been traced o any of the reclamation projects throughout the country. Recycled water is safe for pets, wildlife, and farm animals as well. However, the Town discourages this type of use.
    Recycled Water
  • Yes. The Town is currently studying where to expand its existing recycled water distribution system to most cost effectively expand recycled water delivery. For a map of the current distribution system click on map link.
    Recycled Water

Footer - FAQs

8
  • The Town Council holds regular meetings on the first and third Wednesday of each month at 6:00 pm in the Town Council Chambers. For detailed calendar, visit the agendas and minutes page.
    Footer - FAQs
  • The Town of Windsor's Economic Development Division is your resource for all things business-related. We're your internal advocacy for business-friendly solutions and are happy to assist with questions regarding demographics, location options, incentive programs, permits and Town policies. For more information, visit us at:
    Footer - FAQs
  • Any person whose business is located in Windsor or conducts business in Windsor must apply for a business license within 30 days of the date the business commences. Conducting business in Windsor without a business license may result in penalties, violation notices, citations and court action.
    Footer - FAQs
  • Yes, an Encroachment Permit is required to perform any work in the Town’s right-of-way.
    Footer - FAQs
  • The best way to find out if you need a permit is to call the Building Inspection Division at (707) 838-5341. Discuss your plans with the code official before beginning construction to determine whether you need a permit. Even if a permit is not needed, the code official will answer construction questions and may provide valuable advice.
    Footer - FAQs
  • To learn more, access
    Footer - FAQs
  • Effective June 6, 2009 the maximum amount of time a recreational vehicle can be parked on any public street is 18 hours. After 18 hours you can be fined $146 or risk your vehicle being towed. For further details, see
    Footer - FAQs
  • Street sweeping is done by the Town's franchised waste disposal company. Contact Sonoma County Resource Recovery at (707) 795-7470 or access their schedule via their website: www.sonomacorr.com

    Footer - FAQs

Storm Emergency

8
  • Public Works is the department in the Town of Windsor that handles emergency calls relating to public facilities that are plugged or public roads that are inundated.  Please contact 838-1000. After-hour calls will be automatically routed to the Town’s answering service and will contact the Public Works standby personnel to respond.

    Storm Emergency
  • For public street trees or trees in a public park, contact Public Works at 838-1000.  Residents are responsible for fallen private trees.  If the tree has fallen onto a public street, contact Public Works. If the caller believes the situation is a public safety hazard, call 9-1-1.

    Storm Emergency
  • The Town does not provide sand or sandbags to residents.  Residents may contact the following nearby stores to purchase sand and/or sandbags:

    • Garrett’s Ace Hardware (Windsor) 433-6590, has sand and empty sandbags
    • Home Depot (Windsor) 836-0377, sells premade sandbags
    • Ramm Rock Supply (SR), 528-6067, can make sandbags and sells empty sandbags and bulk sand
    • SBI Landscaping (Windsor) 431-1617, has empty sandbags and bulk sand
    • Whitecap Supply (SR), 586-4330, sells empty bags
    Storm Emergency
  • If your property is in the unincorporated area of Sonoma County, please contact Sonoma County Water Agency Operations at 523-1070.

    Storm Emergency
  • Call 9-1-1.  Stay away from downed power lines.

    Storm Emergency
  • Do not attempt to drive through flood waters.  Contact Public Works at 838-1000 and notify them of the flooded street.  If it is life-threatening emergency situation, call 9-1-1.

    Storm Emergency

Planning

4

2021 Redistricting

6
  • Every 10 years, districts must be redrawn so that each district is substantially equal in population. This process, called redistricting, is important in ensuring that each Council member represents about the same number of constituents. Redistricting is done using U.S. Census data, which is expected to be released soon. 

    2021 Redistricting
  • Redistricting determines which neighborhoods and communities are grouped together (aka Communities of Interest) into a district for purposes of electing a Council member. The current Town Council will seek input from the community in selecting the next district map and boundaries. You have the opportunity to share with Council how you think the boundaries should be drawn to best represent your community.  

    2021 Redistricting
  • An interactive map of the current District Map is here. 

    2021 Redistricting
  • The Town will draw district lines following the criteria listed below:

    • Geographically contiguous districts (each Council member district should share a common border with the next)
    • The geographic integrity of local neighborhoods or communities, and the Town shall be respected in a manner that minimizes division
    • Easily identifiable boundaries that follow natural or artificial barriers (rivers, streets, highways, rail lines, etc.)
    • Lines drawn to encourage geographic compactness. In addition, boundaries shall not be drawn for purposes of favoring or discriminating against a political party. 
    2021 Redistricting
  • The Town will reach out to local media to publicize the redistricting process. Also, the Town will make a good faith effort to notify community groups of various kinds about the redistricting process. Public hearings will be provided in applicable languages if residents submit a request 72-hours in advance. The Town will also post maps online before adoption and have created a dedicated webpage for all relevant information about the redistricting process. 

    2021 Redistricting
  • Please reach out to the Town Clerk's Office at townclerk@townofwindsor.com. 

    2021 Redistricting

Monthly Billing - August 2022

6
  • Monthly billing offers customers smaller, more manageable payments and better aligns with other monthly expenses, making it easier for you to manage household budgets. A monthly bill is also a better tool to help you understand consumption habits, because it provides more timely information about water use and more frequent opportunities to identify and repair leaks that might otherwise go undetected.

    Monthly Billing - August 2022
  • Yes, you will be able to view and pay your monthly bills online.  

    Monthly Billing - August 2022
  • If your automatic payments are set up through WaterSmart, you do not need to change anything – your payments will automatically adjust. However, if you established recurring payments through your personal banking website, you will likely need to adjust the payment per the monthly due date reflected on your bill. 

    Monthly Billing - August 2022
  • Your water charges cover a period of one month instead of two, and bill payment is now due on the 10th monthly rather than bi-monthly.

    The meter reading and the consumption history show approximately 30 days. However, depending on the read date, your new bill will typically reflect usage in a range of 28 to 32 days of service. (Note that during the transition to monthly billing, bills will likely include more or even fewer days than this range until the billing cycles and readings are entirely transitioned over to the 30-day billing period.)

    Monthly Billing - August 2022
  • Benefits of monthly billing include:

    • Smaller, manageable payments.
    • More efficient household budgeting: Your water bill will now arrive at a similar frequency with most other utility bills such as gas and electric, making your monthly budget that much simpler.
    • Timely water use information: Monitoring your water use can help you understand consumption habits and manage water costs.
    • Detect possible water leaks quickly: With more timely information, you’ll easily notice if your water use is different from normal. This allows for the early detection and prompt repair of leaks, reducing the possibility of a high water bill.
    Monthly Billing - August 2022
  • The Town is posting information on our website and social media, and reaching out to customers via newsletter, e-mail, bill messages, and postcards. 

    Monthly Billing - August 2022

Transient Occupancy Tax (TOT)

11
  • The Transient Occupancy Tax has been part of the Town’s code for many years and was last updated in 2008 when, by voter approval the TOT rate increased from 8% to 12%, below is a link to the Town Code. https://library.municode.com/CA/Windsor/CODES/Code_of_Ordinances?nodeId=TITIIRETA_CH3TROCTA

    Transient Occupancy Tax (TOT)
  • Short-term rental operators are required to report and remit returns, together with payment, by the close of business on the last day of each month for the preceding month.

    Each month, operators will report:

    Transient Occupancy Tax (TOT)
  • TOT is paid monthly by Hotels/Motels and the Town requests that the STRs pay monthly as well using our online platform. 

    TOT is due and payable before the end of the following month. A 10% late charge will be assessed on any unpaid TOT based off your gross receipts.


    Transient Occupancy Tax (TOT)
  • During the August 17, 2022, Council meeting Item 13.1 Urgency Ordinance – Moratorium on New Business Licenses for Short-term Rentals was presented and during the discussion we received direction from the Town Council to pursue the collection of TOT for all STR’s.

    TOT is due and payable before the end of the following month. A 10% late charge will be assessed on any unpaid TOT based off your gross receipts.

    Transient Occupancy Tax (TOT)
  • Any operator who fails to file the return and remit the tax within the time required shall pay penalty and interest. Interest is equal to one-half (0.5) percent per month as well as a penalty of 10% for each month. The penalty rates increase by an additional 10% per month. Penalties and interest cannot be contested or waived. Failure to remit TOT can result in a revocation lien against an owner, operator and authorized agent.

    Transient Occupancy Tax (TOT)
  • The exemptions allowed to filed for TOT per the Municipal Code are Government employees and 31+ day stays. A form is required for each exemption claimed and are located in the TOT Portal or on our website: Exemption Forms

    Transient Occupancy Tax (TOT)
  • Questions regarding TOT can be directed to the Revenue Department by calling (707) 838-1004, emailing us at TOT@townofwindsor.com or visiting us during  business hour, Monday through Thursday, from 7:00 to 6:00 PM

    Transient Occupancy Tax (TOT)
  • On June 21, 2023, the Town Council adopted an ordinance regulating short-term rentals (STRs), which went into effect on July 21, 2023. The adopted ordinance is available here. You can also visit our website for Short-Term Rentals.

    Transient Occupancy Tax (TOT)
  • You can contact Planning by email to submit comments or suggestions at str@townofwindsor.com or mail comments to Planning attention Short-term Rentals: 9291 Old Redwood Highway Bldg. 400, Windsor, CA  95492

    Transient Occupancy Tax (TOT)
  • BIA is the Business Improvement Area assessment of 2% that is paid to Sonoma County for the “Sonoma County Tourism Business Improvement Area Fund.”  Currently, if your gross receipts are more than $350,000.00 per fiscal year you are required to pay the 2% when you submit your TOT, otherwise you can put N/A or 0 for line 4 on the remittance form. 


    Transient Occupancy Tax (TOT)

Short-Term Rental

8
  • There are two types of STRs, hosted and non-hosted. The ordinance defines both type of STRs.

    Short-Term Rental
  • A hosted STR is an STR where the owner or primary occupant occupies a bedroom in the dwelling unit or an accessory dwelling unit (ADU) on the same site as the STR during the entire rental period. The ADU may not be used as the STR. A hosted STR also includes a STR where the owner or primary occupant is the permanent resident of the dwelling being rented as the STR, and rents the dwelling for a maximum of 60 nights per calendar year without occupying a bedroom in the dwelling during the entire period. 

    Short-Term Rental
  • Hosted STRs are allowed in all residential zoning districts and in the Neighborhood Commercial (NC), Community Commercial (CC), Town Center (TC), Town Center-Active Use Frontage Overlay (TC-AUFO), and Town Center-Entertainment Overlay zones with Town approval of a STR license. 

    Short-Term Rental
  • A non-hosted STR is an STR where the owner or primary occupant does not occupy a bedroom in the dwelling for one or more nights during the rental period. 

    Short-Term Rental
  • Non-hosted STRs are allowed in the Neighborhood Commercial (NC), Community Commercial (CC), Town Center (TC), Town Center-Active Use Frontage Overlay (TC-AUFO), and Town Center-Entertainment Overlay zones with Town approval of a STR license.

    Short-Term Rental
  • Non-hosted STRs are prohibited in all residential zoning districts.

    Short-Term Rental
  • In order to operate a hosted STR in a residential district, or a hosted or non-hosted STR in certain commercial districts, a STR license is required, along with the required STR license application fee, and submittal documents. The STR license application is done through an online portal available here. Click here for a sample site plan and floor plan that is required to be submitted with the STR License application. A business license and a fire inspection are also required.

    Short-Term Rental
  • You should first contact the host and/or owner to file a complaint with them through the notices provided by the Town. If this is an ongoing issue, please contact Planning staff at str@townofwindsor.ca.gov and provide the date, time, and nature of the complaint(s) and the response from the host/owner. Staff will follow up with the host/owner and the complainant. 

    Click here for instructions on reporting noise disturbances. 

    Short-Term Rental

Windsor Creek Multi-Family Housing Project

5
  • The table below shows Windsor’s RHNA for the 2023-2031 eight-year housing cycle in the first column. The second column shows the number of building permits issued as of the end of 2025. The last column shows the number of units remaining to meet the RHNA.  

    Regional Housing Needs Allocation 2023 – 2031 and Progress Towards Compliance

    Income Category (1)

    (Percental of Area Median Income)

    Number of Units

    Assigned (1)

    Building Permits Issued 2023-2025 (2)

    Remaining Units Needed 2026-2031

    Very Low (0-50%)

    385

    10

    375

    Low (51 – 80%)

    222

    225

    0

    Moderate (80-120%)

    108

    16

    92

    Above Moderate (+120%)

    279

    171

    108

    Total Units 

    994

    422

    575

    Source: 

    (1) 2023-2031 Housing Element Table 6.1 – Regional Housing Needs Allocation

    (2) 2025 Annual Housing Element Progress Report to California Department of Housing and Community Development


    Windsor Creek Multi-Family Housing Project
  • Windsor’s 2023-2031 Housing Element shows that there is enough land zoned to accommodate 2,137 units as show comprised of Approved Projects (Housing Element Table 6.3), Planned/Pending Projects (Housing Element Table 6.4), and projects that could be built on vacant sites and underutilized sites (Housing Element Tables 6.5 and 6.6).

    Windsor Creek Multi-Family Housing Project
  • The proposed Windsor Creek Multi-Family Project differs from recent affordable housing projects because it requires a General Plan Amendment, Station Area Plan Amendment, and Rezoning to change the allowed use of the site from Public to a Residential designation that would allow the density and unit type proposed.  Other recent affordable housing projects, such as Shiloh Terrace, Shiloh Crossing, Heritage Park, Cora Creek, and Elowen Oak, are located on sites that allowed housing because the designation was residential or mixed-use.

    Windsor Creek Multi-Family Housing Project
  • General Plan Amendments, Station Area Plan Amendments, and Zoning Amendments require Planning Commission review and recommendation to the Town Council and Town Council approval. The Town’s Zoning Code includes the findings that the Town Council must make in order to approve these amendments.

    Windsor Creek Multi-Family Housing Project
  • Environmental review consistent with the California Environmental Quality Act (CEQA) would be required for the project. Based on the size, location, and approvals required for the project, it is anticipated that an environmental impact report would be required (EIR). As part of the EIR process, the technical studies and environmental reports required for the project would be identified, such as a transportation impact study (TIS), biological assessment, and evacuation analysis.

    Windsor Creek Multi-Family Housing Project

Accessory Dwelling Units

4
  • The following units are allowed per California Government Code CHAPTER 13 for Accessory Dwelling Units [66310 - 66342], and JADUs.

    On a Single-Family Lot

    A property with an existing or proposed single-family home may be eligible for the following:

    1. One ADU made through a conversion (Government Code 66323 Unit)
    2. One Junior ADU (JADU) (Government Code 66323 Unit)
    3. One new construction detached ADU (Government Code 66323 Unit)
    4. One ADU created using Windsor’s Zoning Code Standards (Government Code 66314 Unit)

    The following additional standards apply to the units listed above:

    1. One ADU Conversion (Gov. Code 66323 Unit)
      • Must be from existing space
      • ADU must be a fully converted unit and cannot add additional space to an existing structure, except the unit may be expanded 150 sq. ft. from the existing structure for ingress and egress
      • ADU can be within setbacks if the existing structure being converted is within the setback
    2. One JADU (Gov. Code 66323 Unit)
      • Can only be created from within an existing or proposed dwelling
      • JADU is 500 sq. ft. maximum
      • Can be created from an attached garage
      • Cannot be detached
      • JADUs cannot be expanded an additional 150 sq. ft. for ingress or egress, this is only for converted ADUs
    1. One New Construction, Detached ADU (Gov. Code 66323 Unit)
      • Can be within the front setback
      • Cannot exceed 800 sq. ft. maximum
      • See the Government Code for applicable height limits between 16 and 20 feet
    1. One ADU Compliant with the Town’s Zoning Code Standards (Gov. Code 66314 Unit)
      • This unit may be new construction or conversion and can be attached, detached, conversion, or conversion plus an addition
      • These units utilize the Town’s Zoning Code Standards for ADUs such as size of structure, height, setbacks, floor area, architectural design, etc.

    On Multi-Family Zoned Lots

    If your property has an existing or proposed multi-family development:

    • Converted ADUs:
      • Up to 25% of existing units (minimum of 1)
    • Detached ADUs:
      • Up to 2 (if new multi-family)
      • Up to 8 (if existing multi-family), not exceeding existing unit count
    • Attached ADUs:
      • 1 new attached unit compliant with Gov. Code 66314 
    Accessory Dwelling Units
  • Per State law and Windsor’s Zoning Code, ADUs & JADUs cannot be used as a short-term rental.

    For a JADU built without its own private bathroom, the owner is required to live on-site, in the main dwelling or JADU. For the complete list of restrictions that must be included in the deed, here is a link to the section in the Town's Zoning Code.

    Accessory Dwelling Units
  • ADU amnesty refers to the process of legalization and issuance of permits for an ADU or JADU originally built without permitting approval. State law requires that jurisdictions issue permits for certain existing ADUs and JADUs originally built prior to January 1, 2020, and eliminate financial penalties to property owners who opt to legalize their unpermitted ADU or JADU. The full text of AB 2533 may be viewed at the following  link, which has been adopted in California Government Code Section 66311.7. Contact Planning staff for assistance with determining eligibility, adu@townofwindsor.ca.gov.

    Accessory Dwelling Units
  • The Building Division has an ADU Building Permit Submittal Checklist to ensure the ADU is processed as efficiently as possible. Click here to access the checklist.

    Prior to finaling the permit, you must also submit the Address Application Form and ADU Acknowledgement Form with the submittal.

    Accessory Dwelling Units
Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow